Tyler Pond Trestle Replacement - Ypsilanti Community Utilities Authority ITB-Tyler Pond Trestle Replacement
Ypsilanti Community Utilities Authority » ITB-Tyler Pond Trestle Replacement
Ypsilanti Community Utilities Authority » ITB-Tyler Pond Trestle Replacement
The information below is a summary of solicitation number ITB-Tyler Pond Trestle Replacement posted by Ypsilanti Community Utilities Authority. As a reminder, this solicitation is closed and responses are no longer being accepted.
Tyler Pond Trestle Replacement
Date Issued: 05/06/2016
Deadline: 06/09/2016 prior to 11:00 AM E.D.T.
Requisition Number:
Delivery Point: Ypsilanti, MI
Delivery Date: July 1, 2017
Type of Purchase: Term: Unspecified
Construction Related: Yes
Type of Response Allowed: Hard Copy Only
Issuing Agency: Ypsilanti Community Utilities Authority
Using Department: Engineering
Special Notices:
All or None Award
Bid Bond Required
Certified Payroll
Installation Required
Insurance Required
Payment Bond Required
Performance Bond Required
Prevailing Wage Required
Some Items are Brand Name or Equal
Prebid Conference Mandatory on 05/19/2016 10:00 AM at Board Room, Eldon P. Ahles Administration Building, 2777 State Road, Ypsilanti, MI 48198
SUMMARY OF SPECIFICATIONS:
The Tyler Pond Trestle Replacement Project consists of re-routing a 24 inch gravity sanitary sewer and a 36-inch sanitary sewer force main. As part of the project, two existing timber trestles will be demolished. A precast concrete arch bridge system will be installed to support the pipes within proposed embankment fill. The Tyler Dam Phase 3 Impoundment Drawdown project will include permanent drawdown activities including dredging, grading, demolition and stabilization. As an alternate to the project, without the dam rehabilitation being completed, the precast concrete arch will be substituted for a steel trestle for the utility crossing.
SIMILAR BIDS FROM YPSILANTI COMMUNITY UTILITIES AUTHORITY
DOCUMENT TITLES | DOCUMENT NUMBER | DEADLINE |
---|---|---|
Tyler Pond Trestle Replacement and Phase 3 Impoundment Drawdown | ITB-Tyler Pond | 7/10/2015 11:00:00 AM |
WWTP Incinerator SO2 Reduction | ITB-WWTP Incinerator SO2 Reduction | 10/7/2014 11:00:00 AM |
Whittaker and Bemis Sanitary Manhole Repair | ITB-Whittaker and Bemis Sanitary Manhole Repair | 9/29/2014 9:02:43 AM |
WWTP Grit Handling System Improvements | ITB-WWTP Grit | 7/2/2014 11:00:00 AM |
Snow Road Pump Station Force Main Repair | ITB-Snow FM Repair | 7/1/2014 2:00:00 PM |
Pearl Relief Sanitary Sewer Repair | ITB-Pearl_Relief_Sewer | 8/20/2012 10:00:00 AM |
WWTP Plant Effluent Water System Improvements | ITB-WWTP PEW Upgrades | 7/10/2012 1:00:00 PM |
Factory Street Pump Station Pump and Drive Replacement | ITB-Factory Street PS | 7/10/2012 11:00:00 AM |
Ecorse/Emerick/I-94 Water Main Improvements | ITB-EE_I-94WM | 4/19/2012 3:30:00 PM |
Snow Road Pump and Drive Replacement | ITB-Snow Road Pump and Drive Replacement | 7/13/2011 2:00:00 PM |