Tyler Pond Trestle Replacement

Date Issued: 05/06/2016

Deadline: 06/09/2016  prior to 11:00 AM   E.D.T.

Requisition Number:

Delivery Point: Ypsilanti, MI

Delivery Date: July 1, 2017

Type of Purchase: Term: Unspecified

Construction Related: Yes

Type of Response Allowed: Hard Copy Only

Issuing Agency: Ypsilanti Community Utilities Authority

Using Department: Engineering

Special Notices: All or None Award
Bid Bond Required
Certified Payroll
Installation Required
Insurance Required
Payment Bond Required
Performance Bond Required
Prevailing Wage Required
Some Items are Brand Name or Equal
Prebid Conference Mandatory on 05/19/2016 10:00 AM at Board Room, Eldon P. Ahles Administration Building, 2777 State Road, Ypsilanti, MI 48198

SUMMARY OF SPECIFICATIONS:

The Tyler Pond Trestle Replacement Project consists of re-routing a 24 inch gravity sanitary sewer and a 36-inch sanitary sewer force main. As part of the project, two existing timber trestles will be demolished. A precast concrete arch bridge system will be installed to support the pipes within proposed embankment fill. The Tyler Dam Phase 3 Impoundment Drawdown project will include permanent drawdown activities including dredging, grading, demolition and stabilization. As an alternate to the project, without the dam rehabilitation being completed, the precast concrete arch will be substituted for a steel trestle for the utility crossing. 

SIMILAR BIDS FROM YPSILANTI COMMUNITY UTILITIES AUTHORITY

DOCUMENT TITLES DOCUMENT NUMBER DEADLINE
Tyler Pond Trestle Replacement and Phase 3 Impoundment Drawdown ITB-Tyler Pond  7/10/2015 11:00:00 AM 
WWTP Incinerator SO2 Reduction ITB-WWTP Incinerator SO2 Reduction  10/7/2014 11:00:00 AM 
Whittaker and Bemis Sanitary Manhole Repair ITB-Whittaker and Bemis Sanitary Manhole Repair  9/29/2014 9:02:43 AM 
WWTP Grit Handling System Improvements ITB-WWTP Grit  7/2/2014 11:00:00 AM 
Snow Road Pump Station Force Main Repair ITB-Snow FM Repair  7/1/2014 2:00:00 PM 
Pearl Relief Sanitary Sewer Repair ITB-Pearl_Relief_Sewer  8/20/2012 10:00:00 AM 
WWTP Plant Effluent Water System Improvements ITB-WWTP PEW Upgrades  7/10/2012 1:00:00 PM 
Factory Street Pump Station Pump and Drive Replacement ITB-Factory Street PS  7/10/2012 11:00:00 AM 
Ecorse/Emerick/I-94 Water Main Improvements ITB-EE_I-94WM  4/19/2012 3:30:00 PM 
Snow Road Pump and Drive Replacement ITB-Snow Road Pump and Drive Replacement  7/13/2011 2:00:00 PM 

Get Automatic Notification and More


REGISTER

  • Real-time notification of solicitations, addenda and awards
  • Advance notice of term contract expirations
  • Full customer service support
  • Opportunities matched to your business
  • Access opportunities from all member agencies in one location