PRIORITY 1B AND SELECT IMPROVEMENTS PROJECT, SRF NO. 5446-01 - Wayne County Drain Commissioner IFB-GT-001
Wayne County Drain Commissioner » IFB-GT-001
Wayne County Drain Commissioner » IFB-GT-001
The information below is a summary of solicitation number IFB-GT-001 posted by Wayne County Drain Commissioner. As a reminder, this solicitation is closed and responses are no longer being accepted.
PRIORITY 1B AND SELECT IMPROVEMENTS PROJECT, SRF NO. 5446-01
Date Issued: 04/29/2016
Deadline: 06/28/2016 prior to 3:00 PM E.D.T.
Requisition Number: IFB-MRIDDD-001
Delivery Point: TBD
Delivery Date: TBD
Type of Purchase: Term: Unspecified
Construction Related: Yes
Type of Response Allowed: Hard Copy Only
Issuing Agency: Wayne County Drain Commissioner
Using Department: Wayne County DPS - Environmental Services Group
Special Notices:
American Iron & Steel requirements
Bid Bond Required
Certified Payroll
Disadvantaged Business Enterprise (DBE)
Federally Funded
Insurance Required
Maintenance Bond Required
Minority Business Participation
Payment Bond Required
Performance Bond Required
Prevailing Wage Required
Women-Owned Business Participation
Onsite Visit Mandatory on 05/16/2016 01:30 PM at 1190 Parkway Drive, Grosse Pointe Woods, MI, then 1130 Lake Shore Dr., Grosse Pointe Shores, MI
Prebid Conference Mandatory on 05/16/2016 10:00 AM at Downriver Wastewater Treatment Facility, Administration Bldg., 797 Central Avenue, Wyandotte, MI
ACCEPTING VENDOR QUESTIONS:
Due Date: 6/15/2016 5:00:00 PM E.D.T.
Primary Contact Name: Mr. James Rydquist
Title: Engineering Contact
Email: James.Rydquist@tetratech.com
SUMMARY OF SPECIFICATIONS:
MILK RIVER INTERCOUNTY DRAIN DRAINAGE DISTRICT, MACOMB AND WAYNE COUNTY, MICHIGAN, INVITATION FOR BIDS FOR PRIORITY 1B AND SELECT IMPROVEMENTS PROJECT, STATE REVOLVING FUND PROJECT NO. 5446-01; The Milk River Intercounty Drain Drainage District is requesting bids for the Priority 1B and Select Improvements Project consisting of storm pump and motor rehabilitation, new flushing gate systems, electrical service improvements and upgrades, mechanical and piping work in the sanitary pump station, ground water and flushing water pump replacement, new grit pumps, dewatering pump replacement, architectural and structural improvements to the Milk River Pump Station building, Disinfection Building, Blower Building and, disinfections system improvements, HV and electrical instrumentation improvements at the Milk River CSO RTB and a new chemical feed room addition to the Screen building, a new mussel control chemical feed system with bulk storage, feed pumps and piping, installation of a new mechanical bar screen, cleaning and repairs to the intake pipe and crib, yard piping and valve improvements, tainter gate driver replacement and a repair to the leaking recirculation water forcemain for the Milk River Recirculation Pump Station. PLEASE REVIEW THE FORMAL SPECIFICATIONS FOR ADDITIONAL INFORMATION AND SUBMITTAL REQUIREMENTS. FAILURE TO ADHERE MAY RESULT IN YOUR BID BEING DEEMED NON-RESPONSIVE