Environmental Discovery Center HVAC Control System Replacement - Huron-Clinton Metropolitan Authority ITB-715-17-020

Huron-Clinton Metropolitan Authority » ITB-715-17-020

The information below is a summary of solicitation number ITB-715-17-020 posted by Huron-Clinton Metropolitan Authority.  As a reminder, this solicitation is closed and responses are no longer being accepted.

Environmental Discovery Center HVAC Control System Replacement

Date Issued: 05/04/2017

Deadline: 05/18/2017  prior to 2:00 PM   E.D.T.

Requisition Number:

Delivery Point: Brighton, MI

Delivery Date: September 30, 2017

Type of Purchase: Term: Unspecified

Construction Related: Yes

Type of Response Allowed: Hard Copy Only

Issuing Agency: Huron-Clinton Metropolitan Authority

Using Department: Engineering

Special Notices: Bid Bond Required
Insurance Required
Labor and Materials Bond Required
Maintenance Bond Required
Performance Bond Required

SUMMARY OF SPECIFICATIONS:

Replacement of the HVAC Control System at the Environmental Discovery Center at Indian Springs Metropark. 

Get Automatic Notification and More


REGISTER

  • Real-time notification of solicitations, addenda and awards
  • Advance notice of term contract expirations
  • Full customer service support
  • Opportunities matched to your business
  • Access opportunities from all member agencies in one location