The information below is a summary of solicitation number RFP-RM-Phase IIIa Project C-10 Roof Helix-Bridge Restoration posted by Detroit Regional Convention Facility Authority. As a reminder, this solicitation is closed and responses are no longer being accepted.
Phase IIIa Project C-10 Roof Helix-Bridge & Load Dock Restoration
Date Issued: 08/07/2012
Deadline: 08/24/2012 prior to 11:00 AM E.D.T.
Requisition Number:
Delivery Point: F.O.B Cobo Center, Detroit, MI
Delivery Date: .
Type of Purchase: Term: Unspecified
Construction Related: No
Type of Response Allowed: Hard Copy Only
Issuing Agency: Detroit Regional Convention Facility Authority
Using Department: Capital
Special Notices:
100% Performance/Payment
All or None Award
Bid Bond Required
Brand Name or Approved Equal
FOB Destination
Installation Required
Insurance Required
Payment Bond Required
Payment Terms = Net 45 Days
Performance Bond Required
Value Added Clause in Specifications
Warranty Information Required
ACCEPTING VENDOR QUESTIONS:
Due Date: 8/17/2012 4:00:00 PM E.D.T.
Primary Contact Name: Mr. John Kull
Title: email questions Only Please
Email: jkull@cobocenter.com
SUMMARY OF SPECIFICATIONS:
The Detroit Regional Convention Facility Authority is requesting all vendors to provide all required design, labor, material, delivery, hoisting, public safety, tool, equipment & material security, temporary power, and incidentals to properly remove and replace concrete and expansion joints at both the Roof Parking Helix & Bridge and the rear Loading Dock and to include all necessary transportation costs, fees, permits, taxes, insurance, overhead, profit, etc. as descibed including all items incidental thereto or necessary to complete the Work, though not specifically mentioned, in accordance with contract documents, F.O.B. COBO Center, Detroit, Michigan.
SIMILAR BIDS FROM DETROIT REGIONAL CONVENTION FACILITY AUTHORITY/HUNTINGTON PLACE-DETROIT
DOCUMENT TITLES | DOCUMENT NUMBER | DEADLINE |
---|---|---|
Re-striping of Cobo Center Parking Facilities | RFP-RP-Re-striping of Cobo Center Parking Facilities | 6/24/2016 12:00:00 PM |
IIIa, C-12 COBO Sq/Atwater St. Conc, WP, EJ, & JS RFP | RFP-PE-IIIa, C-12 COBO Sq/Atwater St. Conc, WP, EJ, & JS RFP | 7/2/2014 11:00:00 AM |
IIIb C-2 S. Renovation Masonry Matls ONLY RFP No 03 | RFP-PE-IIIb C-2 S. Renovation Masonry Matls ONLY RFP No 03 | 6/23/2014 5:00:00 PM |
RFP-TW-Phase llla, Proj. C-12 & Phase lllb, Proj. C-4 Concrete RFP | RFP-TW-Phase llla, Proj. C-12 & Phase lllb, Proj. C-4 Concre | 2/27/2014 5:06:31 PM |
Tools Hardware and Miscellaneous Material | RFP-RM-Tools Hardware and Miscellaneous Material | 9/9/2013 11:00:00 AM |
Tools | RFP-RM-Phase IIIb, Project C-2 Tool | 8/8/2013 11:00:00 AM |
Concrete | RFP-RM-Concrete | 5/30/2013 2:00:00 PM |
Epoxy Flooring | RFP-RM-Epoxy Flooring-No. 35 | 12/10/2012 2:00:00 PM |
Paint and Wall Covering | RFP-RM-Project 35 - Paint and Wall Covering | 10/8/2012 2:00:00 PM |
Pull-Off Area | RFP-RM-Phase IIIa, Project C-16 Cobo Pull-off area | 9/7/2012 3:00:00 PM |