Taylor Meadows Storm Water Construction - City of Taylor IFB-RM-04-13-2017-001
City of Taylor » IFB-RM-04-13-2017-001
City of Taylor » IFB-RM-04-13-2017-001
The information below is a summary of solicitation number IFB-RM-04-13-2017-001 posted by City of Taylor. As a reminder, this solicitation is closed and responses are no longer being accepted.
Taylor Meadows Storm Water Construction
Date Issued: 04/13/2017
Deadline: 04/20/2017 prior to 1:40 PM E.D.T. (Canceled, See Addenda Area For Details)
Requisition Number:
Delivery Point: 6779 Beech Daly Rd Taylor MI 48180
Delivery Date: May 26, 2017
Type of Purchase: Term: Unspecified
Construction Related: No
Type of Response Allowed: Hard Copy Only
Issuing Agency: City of Taylor
Using Department: Taylor Meadows Golf Course
Special Notices:
All or None Award
Bid Bond Required
Contractors License Required
Insurance Required
Performance Bond Required
Warranty Information Required
Job-Walk Visit Recommended on 04/21/2017 02:00 PM at North East corner of Beech Daly and Newcastle Road, 6779 Beech Daly Road, Taylor MI 48180
ACCEPTING VENDOR QUESTIONS:
Due Date: 4/25/2017 3:00:00 PM E.D.T.
Primary Contact Name: Mr. Richard Miller
Title: Purchasing Agent
Email: rmiller@ci.taylor.mi.us
SUMMARY OF SPECIFICATIONS:
The work shall consist of, but not be limited to: (1) construction of nine (9) catch basins; (2) installation of approximately 607 linear feet of 12” diameter and 75 linear feet of 6” diameter storm lines; (3) adjusting rim height of an existing storm structure; (4) installation of a storm water treatment system; and (5) construction survey. The following plans shall be part of these Specifications and Contract: Bud Design & Engineering Services, Inc.: C3.0, C4.0, C5.0 and C6.0 Wade Trim/City of Taylor Existing Utility Plan: D1 Wade Trim/City of Taylor Standard Details: ST-1 and ST-2
SIMILAR BIDS FROM CITY OF TAYLOR
DOCUMENT TITLES | DOCUMENT NUMBER | DEADLINE |
---|---|---|
HERITAGE PARK -WORLD SERIES FIELD DRAINAGE IMPROVEMENTS | IFB-RM- TAY 3222-01T | 6/13/2017 10:00:00 AM |
SAW GRANT SEWER CLEANING AND CLOSED CIRCUIT TELEVISION PHASE 2 | IFB-RM-04-21-2017 | 5/16/2017 10:00:00 AM |
Taylor Meadows Storm Water Construction | IFB-RM-04-21-2017-002 | 5/4/2017 10:00:00 AM |
Ditch Enclosure Program | IFB-EW-11-27-2012 | 10/29/2013 12:00:48 PM |