Concrete Replacement 2017 - City of Taylor IFB-RM-05-26-2017-002
City of Taylor » IFB-RM-05-26-2017-002
City of Taylor » IFB-RM-05-26-2017-002
The information below is a summary of solicitation number IFB-RM-05-26-2017-002 posted by City of Taylor. As a reminder, this solicitation is closed and responses are no longer being accepted.
Concrete Replacement 2017
Date Issued: 05/26/2017
Deadline: 06/08/2017 prior to 10:00 AM E.D.T.
Requisition Number:
Delivery Point: Various
Delivery Date: Various
Type of Purchase: Term: 7/1/2017 to 12/31/2018
Construction Related: No
Type of Response Allowed: Hard Copy Only
Issuing Agency: City of Taylor
Using Department: Department of Public Works
Special Notices:
All or None Award
Bid Bond Required
Contractors License Required
Installation Required
Insurance Required
Performance Bond Required
ACCEPTING VENDOR QUESTIONS:
Due Date: 6/6/2017 3:00:00 PM E.D.T.
Primary Contact Name: Mr. Richard Miller
Title: Purchasing Agent
Email: rmiller@ci.taylor.mi.us
SUMMARY OF SPECIFICATIONS:
The work shall consist of, but not be limited to: (1) removing existing concrete street pavement in sections or partial and full width sections of various lengths; (2) repairing miscellaneous areas of concrete pavement deterioration and restoration of utility repair areas; (3) preparing the subbase and replacing the concrete pavement; (4) adjusting and/or reconstructing drainage and other public utility structures; (5) sidewalk removal and replacement, including ADA crosswalks; (6) traffic control, restoration and clean-up; and, (7) storm structure and pipe cleaning.
SIMILAR BIDS FROM CITY OF TAYLOR
DOCUMENT TITLES | DOCUMENT NUMBER | DEADLINE |
---|---|---|
HMA Repairs and Resurfacing 2017 | IFB-RM-05-26-2017-003 | 6/8/2017 10:00:00 AM |
Heritage Park/WCC Connecting Path | IFB-RM-03-30-2017-001 | 4/24/2017 10:00:00 AM |
HMA Joint and Crack Seal | IFB-RM-03-29-2017-001 | 4/10/2017 10:00:00 AM |
CDBG Driveway and Porch Replacement | WQ-RM-09-16-2016-002 | 9/26/2016 2:00:00 PM |
Concrete Street Joint and Crack Seal | IFB-RM-09-14-2016 | 9/26/2016 11:00:00 AM |
Taylor Meadows Cart Barn | IFB-RM-06-07-02016 | 6/24/2016 2:45:00 PM |
CDBG Leaking Front Porch and Waterproofing | QR-RM-05-31-2016-001 | 6/14/2016 3:00:00 PM |
Floor Bracing | QR-RM-05-31-2016-002 | 6/14/2016 3:00:00 PM |
Taylor compost Site Concrete Scale Ramp Repalcement | WQ-RM-03-24-2016-001 | 4/8/2016 3:00:00 PM |
CDBG Waterproofing and Floor Bracing | QR-RM-11-6-2015-003 | 11/20/2015 2:00:00 PM |