Granzon Ave. Reconstruction Project - City of Oak Park M-650
City of Oak Park » M-650
City of Oak Park » M-650
The information below is a summary of solicitation number M-650 posted by City of Oak Park. As a reminder, this solicitation is closed and responses are no longer being accepted.
Granzon Ave. Reconstruction Project
Date Issued: 01/18/2017
Deadline: 02/06/2017 prior to 2:00 PM E.S.T.
Requisition Number:
Delivery Point: Oak Park, MI
Delivery Date: May 15, 2017
Type of Purchase: Term: Unspecified
Construction Related: Yes
Type of Response Allowed: Hard Copy Only
Issuing Agency: City of Oak Park
Using Department: Engineering
Special Notices:
All or None Award
Bid Bond Required
Insurance Required
Maintenance Bond Required
Payment Bond Required
Performance Bond Required
ACCEPTING VENDOR QUESTIONS:
Due Date: 2/2/2017 3:00:00 PM E.S.T.
Primary Contact Name: Ms. Jennifer Wilson
Title: Engineering Tech II
Email: jwilson@oakparkmi.gov
SUMMARY OF SPECIFICATIONS:
Sealed proposals for the GRANZON AVENUE RECONSTRUCTION PROJECT, M-650 will be received by the Oak Park City Clerk at the City Hall, 14000 Oak Park Blvd., Oak Park, MI 48237, until 2:00 P.M., local time, Monday February 5, 2017, at which time and place they will be publicly opened and read aloud. The approximate quantities of work involved in the project are as follows: Mobilization, Max 5% 1 LSUM Pavement Removal, Modified SP 11,000 SYD Drainage Structure, Removing, Modified SP 15 EACH Subgrade Undercutting, (Modified) 500 CYD Machine Grading, Modified SP 25.50 STA Erosion Control, Inlet Protection, Fabric Drop, Modified SP 30 EACH Aggregate Base Under Concrete (6" 21AA Crush Limestone) 9,500 SYD Maintenance gravel, Modified SP 300 TON Drainage Structure, 24 Inch (Inlet), Modifed SP 13 EACH Drainage Structure, 48 Inch Diameter, Modified SP 12 EACH Drainage Structure Cover 3,800 LBS Adjusting Drainage Structure Cover Case 1, Modified SP 15 EACH Underdrain Subgrade, Open Graded 6", Modifed SP 300 LFT Conc. Pavement, Non-Reinf 7" Conc., Modified SP 9,500 SYD Sidewalk Conc.- NonReinf.8" Conc. Sidewalk/Drive App., Modified SP 500 SFT Sidewalk Conc.- NonReinf.6" Conc. Sidewalk/Drive App. Modified SP 8,700 SFT Sidewalk Conc.- NonReinf.4" Concrete Sidewalk Modified SP 5,700 SFT Cast In Place Detectable/ Tactile Warning Surface. 600 SFT Class A Sodding, Modified SP 5,500 SYD Minor Traffic Device, Modified SP 1 LSUM Salvage Sign, Modified SP 20 EACH Sewer Pipe, 12” Class IV Reinf. Conc. Pipe 725 LFT Sewer remove, under 24” 725 LFT Copies for bidding purposes may be obtained through the Michigan Inter-governmental Trade Network (MITN). Contact Jennifer L. Wilson at (248) 691-7450 with any questions. Each proposal shall be accompanied by a certified check, cashier's check, money order or bid bond by a surety company licensed to do business in the State of Michigan in the amount of at least five (5%) percent of the amount bid, drawn payable to the City of Oak Park, Michigan, as security for the proper execution of the Contract.
SIMILAR BIDS FROM CITY OF OAK PARK
DOCUMENT TITLES | DOCUMENT NUMBER | DEADLINE |
---|---|---|
2016 Sewer & Catch Basin Cleaning & Television Inspection Project | M-641 | 9/6/2016 10:00:00 AM |
Nine Mile Pipe Bursting Project | M-647 | 8/23/2016 10:00:00 AM |
2016-2017 Miscellaneous Concrete Project, M-644 | M-644 | 8/22/2016 10:00:00 AM |
2016 SIDEWALK REPLACEMENT PROJECT | M-627 | 6/20/2016 2:00:00 PM |
SCOTIA ROAD RESURFACING PROJECT | M-642 | 6/20/2016 10:00:00 AM |
2015-2016 MISCELLANEOUS CONCRETE PROJECT | M-621 | 9/15/2015 2:00:00 PM |
2015 Sewer Cleaning and Televison Inspection Project | M-626 | 8/31/2015 10:00:00 AM |
2015 Sewer Lining Project | M-623 | 8/4/2015 2:00:00 PM |
2015 SHEPHERD PARK PARKING LOT RECONSTRUCTION PROJECT | M-608 | 6/1/2015 2:00:00 PM |
2015 CATCH BASIN LINE REPLACEMENT & SEWER LATERAL REPAIR PROJECT | 606 | 5/26/2015 10:00:00 AM |