2016 UTILITY CUTS PERM RESTORATION - City of Lansing ITB-17-028
City of Lansing » ITB-17-028
City of Lansing » ITB-17-028
The information below is a summary of solicitation number ITB-17-028 posted by City of Lansing. As a reminder, this solicitation is closed and responses are no longer being accepted.
2016 UTILITY CUTS PERM RESTORATION
Date Issued: 08/31/2016
Deadline: 09/20/2016 prior to 2:00 PM E.D.T.
Requisition Number:
Delivery Point: Lansing, MI
Delivery Date: TBD
Type of Purchase: Term: Unspecified
Construction Related: No
Type of Response Allowed: Hard Copy Only
Issuing Agency: City of Lansing
Using Department: PUBLIC SERVICE ENGINEERING
Special Notices:
All or None Award
Bid Bond Required
Insurance Required
Payment Bond Required
Performance Bond Required
Prevailing Wage Required
Prebid Conference Mandatory on 09/13/2016 09:00 AM at 1232 HACO DR LANSING MI ROOM 107
ACCEPTING VENDOR QUESTIONS:
Due Date: 9/15/2016 3:00:00 PM E.D.T.
Primary Contact Name: Mrs. STEPHANIE ROBINSON
Title: SENIOR BUYER
Email: SLR@LBWL.COM
SUMMARY OF SPECIFICATIONS:
MAJOR CONTRACT ITEMS: This contract will perform the permanent restoration for the utility cuts provided in the attached “2016 Utility Cuts Permanent Restoration” table. The table is listed by street name in alphabetical order for the utility cuts that are ready for permanent restoration and then again in alphabetical order by street name for the utility work / cuts that have yet to be completed by the LBWL. The project is located on approximately 180 different streets throughout the City of Lansing.
SIMILAR BIDS FROM CITY OF LANSING
DOCUMENT TITLES | DOCUMENT NUMBER | DEADLINE |
---|---|---|
FIRE STATION #8 APRON IMPROVEMENTS | ITB-17-087 | 5/23/2017 2:00:00 PM |
PAVEMENT CRACK SEALING PROJECT | ITB-17-081 PAVEMENT CRACK SEALING | 5/18/2017 2:00:00 PM |
SIDEWALK TRIP HAZARD REMEDIATION | ITB-17-061 | 2/21/2017 2:00:00 PM |
GRAND RIVER PARK BOAT RAMP RENOVATIONS | ITB-16-113 | 6/21/2016 2:00:00 PM |
B-16-099 PAVEMENT AND SIDEWALK RESTORATION | ITB-16-099 | 4/26/2016 2:00:00 PM |
2015 SIDEWALK REPAIR PROJECT | ITB-15-051 | 5/28/2015 3:00:00 PM |
SEALING CITY HALL PLAZA | RFQ-15-089 | 5/22/2015 10:00:00 AM |
SIDEWALK TRIP HAZARD REMEDIATION CONCRETE CUTTING | ITB-15-073 | 4/28/2015 3:00:00 PM |
SIDEWALK TRIP HAZARD REMEDIATION CONCRETE GRINDING | ITB-15-082 | 4/28/2015 3:00:00 PM |
BWL UTILITY CUT REPAIR | ITB-15-081 | 4/16/2015 3:00:00 PM |