HP Emergency Water Main Repair Services - City of Highland Park RFP-Emergency Water Main Repair Services
City of Highland Park » RFP-Emergency Water Main Repair Services
City of Highland Park » RFP-Emergency Water Main Repair Services
The information below is a summary of solicitation number RFP-Emergency Water Main Repair Services posted by City of Highland Park. As a reminder, this solicitation is closed and responses are no longer being accepted.
HP Emergency Water Main Repair Services
Date Issued: 08/29/2016
Deadline: 09/22/2016 prior to 10:00 AM E.D.T.
Requisition Number:
Delivery Point: Highland Park, MI 48203
Delivery Date: -
Type of Purchase: Term: Unspecified
Construction Related: No
Type of Response Allowed: Hard Copy Only
Issuing Agency: City of Highland Park
Using Department: Department of Water & Sewer
Special Notices:
Bids will be opened 9/26/16 @ 7pm
Insurance Required
ACCEPTING VENDOR QUESTIONS:
Due Date: 9/8/2016 3:00:00 PM E.D.T.
Primary Contact Name: Mr. Damon Garrett
Title: Director of the Department of Water & Sewer
Email: DGarrett@MetroCA.net
SUMMARY OF SPECIFICATIONS:
The work covered...includes but is not limited to the following: a) Project is to include the repair of water main breaks or third party water main damage. b) Contractor shall provide all labor, material and equipment to perform system repair services as needed. c) Saw-cutting and removing asphalt or concrete surface, excavating, aggregates needed for backfill and soil compaction is included in the unit price for related items of work. a) The contractor is responsible for installing fittings, gaskets, bracing or sheeting, blocking and miscellaneous items for installing pipe and reconnecting to the Municipal Water System. b) Contractor is responsible for construction spoils removal c) Any dewatering needed will be provided by the contractor. d) Contractor is responsible for all permits. e) Contractor is responsible for traffic control. MDOT typicals must be followed on MDOT roadways. f) Contractor is responsible for all site restoration including asphalt, concrete and concrete curbs, fencing and seed or sod replacement. g) Inspection of the site for soil compaction, concrete/asphalt quality, and site restoration by a third party inspector will also be included at the contractor’s expense. Inspection reports will be made available to the city. h) The Contractor must have the ability to respond to an emergency call within 60 minutes. i) Mobilization to the repair site is expected within 90 minutes of accepting work
SIMILAR BIDS FROM CITY OF HIGHLAND PARK
DOCUMENT TITLES | DOCUMENT NUMBER | DEADLINE |
---|---|---|
HP 2016 Cross Connection Control Program | RFP-Cross Connection Control Program | 9/22/2016 10:00:00 AM |
HP Hydrant Replacement & Repair Service | RFP- Hydrant Replacement & Repair Service | 9/22/2016 10:00:00 AM |