2014 Hickory Grove Rd Rehabilitation - Tri Party Program - Bloomfield Township ITB-NM-2014 Hickory Grove Rd Rehabilitation
Bloomfield Township » ITB-NM-2014 Hickory Grove Rd Rehabilitation
Bloomfield Township » ITB-NM-2014 Hickory Grove Rd Rehabilitation
The information below is a summary of solicitation number ITB-NM-2014 Hickory Grove Rd Rehabilitation posted by Bloomfield Township. As a reminder, this solicitation is closed and responses are no longer being accepted.
2014 Hickory Grove Rd Rehabilitation - Tri Party Program
Date Issued: 06/16/2014
Deadline: 07/01/2014 prior to 2:00 PM E.D.T.
Requisition Number:
Delivery Point: Local
Delivery Date: Summer 2014
Type of Purchase: Term: Unspecified
Construction Related: Yes
Type of Response Allowed: Hard Copy Only
Issuing Agency: Bloomfield Township
Using Department: EESD & DPW
Special Notices:
All or None Award
Bid Bond Required
Bidder Prequalification/Preregistration Required
Contractors License Required
FOB Destination
Installation Required
Insurance Required
Labor and Materials Bond Required
Local Service Required
Maintenance Bond Required
No Brand Name Specified
Onsite Maintenance Required
Payment Bond Required
Performance Bond Required
Surety Bond Required
Warranty Information Required
ACCEPTING VENDOR QUESTIONS:
Due Date: 6/26/2014 3:00:00 PM E.D.T.
Primary Contact Name: Mr. Jim Surhigh
Title: Project Engineer
Email: jsurhigh@hrc-engr.com
SUMMARY OF SPECIFICATIONS:
Description of Work The project consists of rehabilitation of the existing HMA road between Square Lake Road and Franklin Road by removing the existing HMA surface, and placing new HMA pavement. Approximate quantities include 9,700 syd of HMA pavement removal, 1,070 ton of HMA 13A, 1,620 ton HMA 3C, 40 ton HMA 2C, and 60 feet concrete curb & gutter. Project also includes earth excavation & grading, aggregate base, culvert removal & replacement, lawn restoration, traffic control, soil erosion control measures, and other items for a complete project. The project will start in August 2014 and be completed by September 2014.
SIMILAR BIDS FROM BLOOMFIELD TOWNSHIP
DOCUMENT TITLES | DOCUMENT NUMBER | DEADLINE |
---|---|---|
Bloomfield Township 2017 Asphalt Resurfacing Program | ITB-NM-2017 Bloomfield Township Asphalt Resurfacing Program | 5/16/2017 2:00:00 PM |
2016 Asphalt Resurfacing Program | ITB-NM-2016 Asphalt Resurfacing Program | 4/12/2016 10:30:00 AM |
2016 Concrete Repair Program | ITB-NM-2016 Concrete Repair Program | 4/12/2016 10:00:00 AM |
2015 Bloomfield Township Asphalt Resurfacing Program | ITB-DP-2015 Bloomfield Township Asphalt Resurfacing Program | 4/14/2015 10:30:00 AM |
Bloomfield Township 2015 Concrete Repair Program | ITB-NM-Bloomfield Township 2015 Concrete Repair Program | 4/14/2015 10:00:00 AM |
Advertisement for Bids - Concord Green & Palmer Woods SAD Paving | ITB-NM-Concord Green and Palmer Woods SAD 413 & 414 | 4/7/2015 10:00:00 AM |
2012 Tri-Party Program Andover Road | ITB-NM-2012 Tri-Party Program Andover Road | 5/9/2012 10:00:00 AM |
Bloomfield Township - 2011 Concrete Repair Program | ITB-NM-ConcreteReplacement | 5/10/2011 2:00:00 PM |